COATING FOR WARMTH , COATING FOR WONDER
TUWANG
Zhejiang Tuwang New Materials Co., Ltd. focuses on the R&D, production and sales of new thermal insulation materials. Founded in 2007, it owns well-known best-selling brands such as "Huoniao FIREBIRD" and "Leweishi RAYWAYS". With the brand spirit of "Coating for Warmth, Coating for a Better Life", we are committed to providing customers with high-quality and high-value one-stop procurement and customization services for thermal insulation products, helping customers easily create more energy-efficient, comfortable and pleasant environments for production, work and living.
At Tuwang, we always adhere to our core principles: in production, we strictly screen raw materials, select the best quality from superior options, and firmly reject mediocre, inferior and environmentally harmful products. We deeply understand that only by using genuine quality to create extra real value for customers can we gain high recognition from users and ensure the company's long-term development.
Learn More
Manufacturer
One-stop procurement for thermal insulation
Supports Customization
Assured Quality
Better Price with Larger Orders
Honors and Qualifications
Construction Steps
1、Clean the Base Surface
Remove efflorescence and hollow areas from the base surface to expose a clean, solid cement substrate (keep the base surface dry before construction).
3、Anti-Alkali Primer / Wall Bonding Agent
2、Leveling
Level the surface using traditional methods such as microcement putty (Purpose: Reduce the consumption of thermal insulation materials).
Apply wall bonding agent emulsion (or similar emulsions) to the wall surface. After waiting 2–3 hours for surface drying, apply the second coat of emulsion. Once the emulsion is fully dry (after 5–7 hours), proceed with thermal insulation construction.
4、Mixing
First, stir thoroughly from the bottom of the container. Then, add an appropriate amount of water (if needed) and stir until the mixture reaches a viscosity suitable for construction (e.g., for troweling or spraying).
6、Waiting for Drying
5、Troweling (or Spraying)
Evenly trowel (or spray) the well-mixed Tuwang thermal insulation material onto the wall surface (a single application can achieve a thickness of 0.5–3 mm).
After drying, the wall can be decorated (options include applying putty with a hard sanding layer, painting, or wallpapering) (Surface drying time: 2–6 hours; complete drying time: 12–36 hours).
Precautions:
Substrate Preparation: Ensure the wall surface is dry and free from moisture. Remove dust, oil stains, and loose layers. Repair cracks to achieve a smooth surface.
Ambient Conditions: Construction temperature should preferably be above 5°C (for equipment applying heat, the temperature should remain below 90°C). Avoid working during rain, snow, or strong wind conditions. Areas with poor ventilation, such as internal corners, require enhanced drying measures.
Technical Requirements: Stir Wangtone Thermal Insulation Coating thoroughly before application. When applying multiple coats, ensure the previous layer is completely dry (typically 2–4 hours). Brushing, troweling, or spraying should be even—avoid excessive water addition or thick application to prevent sagging.
Application Center