涂就温暖,涂就美好
TUWANG
浙江土王新材料有限公司专注于新型热绝缘材料的研发、生产和销售。成立于2007年,拥有"火鸟 Huoniao FIREBIRD"和"雷维士 Leweishi RAYWAYS"等知名畅销品牌。秉承"涂层保温,涂层美好生活"的品牌精神,我们致力于为客户提供高质量、高价值的一站式采购和定制服务,帮助客户轻松创造更节能、舒适、宜人的生产、工作和生活环境。
在土王,我们始终坚持核心原则:在生产中,严格筛选原材料,从优质选项中挑选最佳质量,坚决拒绝平庸、劣质和对环境有害的产品。我们深知,只有用真正的质量为客户创造额外的真实价值,才能获得用户的高度认可,确保公司的长期发展。
了解更多
制造商
热绝缘一站式采购
Supports Customization
Assured Quality
Better Price with Larger Orders
Honors and Qualifications
Construction Steps
1、Clean the Base Surface
Remove efflorescence and hollow areas from the base surface to expose a clean, solid cement substrate (keep the base surface dry before construction).
3、Anti-Alkali Primer / Wall Bonding Agent
2、Leveling
Level the surface using traditional methods such as microcement putty (Purpose: Reduce the consumption of thermal insulation materials).
Apply wall bonding agent emulsion (or similar emulsions) to the wall surface. After waiting 2–3 hours for surface drying, apply the second coat of emulsion. Once the emulsion is fully dry (after 5–7 hours), proceed with thermal insulation construction.
4、Mixing
First, stir thoroughly from the bottom of the container. Then, add an appropriate amount of water (if needed) and stir until the mixture reaches a viscosity suitable for construction (e.g., for troweling or spraying).
6、Waiting for Drying
5、Troweling (or Spraying)
Evenly trowel (or spray) the well-mixed Tuwang thermal insulation material onto the wall surface (a single application can achieve a thickness of 0.5–3 mm).
After drying, the wall can be decorated (options include applying putty with a hard sanding layer, painting, or wallpapering) (Surface drying time: 2–6 hours; complete drying time: 12–36 hours).
Precautions:
Substrate Preparation: Ensure the wall surface is dry and free from moisture. Remove dust, oil stains, and loose layers. Repair cracks to achieve a smooth surface.
Ambient Conditions: Construction temperature should preferably be above 5°C (for equipment applying heat, the temperature should remain below 90°C). Avoid working during rain, snow, or strong wind conditions. Areas with poor ventilation, such as internal corners, require enhanced drying measures.
Technical Requirements: Stir Wangtone Thermal Insulation Coating thoroughly before application. When applying multiple coats, ensure the previous layer is completely dry (typically 2–4 hours). Brushing, troweling, or spraying should be even—avoid excessive water addition or thick application to prevent sagging.
Application Center