畅销产品

专注于隔热保温新材料的研发、生产与销售。

56.1.png
火鸟气凝胶保温涂料_800.png
7459.png
54.1.png

纳米隔热保温涂料

气凝胶保温涂料

防凝露保温涂料

纳米陶瓷隔热保温涂料

涂就温暖,涂就美好

选择浙江涂王的五个理由

科技领先

全能适配

绿色环保

长效耐用

高效节能

科技(1).png
耐用(1).png
绿色环保(1).png
适配(1).png
高效节能-01(1).png
123.jpg

TUWANG

浙江土王新材料有限公司专注于新型热绝缘材料的研发、生产和销售。成立于2007年,拥有"火鸟 Huoniao FIREBIRD"和"雷维士 Leweishi RAYWAYS"等知名畅销品牌。秉承"涂层保温,涂层美好生活"的品牌精神,我们致力于为客户提供高质量、高价值的一站式采购和定制服务,帮助客户轻松创造更节能、舒适、宜人的生产、工作和生活环境。

在土王,我们始终坚持核心原则:在生产中,严格筛选原材料,从优质选项中挑选最佳质量,坚决拒绝平庸、劣质和对环境有害的产品。我们深知,只有用真正的质量为客户创造额外的真实价值,才能获得用户的高度认可,确保公司的长期发展。

1023.png

了解更多

制造商

热绝缘一站式采购

Supports Customization

Assured Quality

Better Price with Larger Orders

生产厂家(1).png
低价优先2(1).png
点赞(1).png
定制(1).png
1025.png
1024.png

Honors and Qualifications

Construction Steps

Clean the Base Surface
Leveling
Anti-Alkali Primer / Wall Bonding Agent

1、Clean the Base Surface

Remove efflorescence and hollow areas from the base surface to expose a clean, solid cement substrate (keep the base surface dry before construction).

3、Anti-Alkali Primer / Wall Bonding Agent

2、Leveling

Level the surface using traditional methods such as microcement putty (Purpose: Reduce the consumption of thermal insulation materials).

Apply wall bonding agent emulsion (or similar emulsions) to the wall surface. After waiting 2–3 hours for surface drying, apply the second coat of emulsion. Once the emulsion is fully dry (after 5–7 hours), proceed with thermal insulation construction.

Mixing
Troweling (or Spraying)
Waiting for Drying

4、Mixing

First, stir thoroughly from the bottom of the container. Then, add an appropriate amount of water (if needed) and stir until the mixture reaches a viscosity suitable for construction (e.g., for troweling or spraying).

6、Waiting for Drying

5、Troweling (or Spraying)

Evenly trowel (or spray) the well-mixed Tuwang thermal insulation material onto the wall surface (a single application can achieve a thickness of 0.5–3 mm).

After drying, the wall can be decorated (options include applying putty with a hard sanding layer, painting, or wallpapering) (Surface drying time: 2–6 hours; complete drying time: 12–36 hours).

Precautions:

Substrate Preparation: Ensure the wall surface is dry and free from moisture. Remove dust, oil stains, and loose layers. Repair cracks to achieve a smooth surface.

Ambient Conditions: Construction temperature should preferably be above 5°C (for equipment applying heat, the temperature should remain below 90°C). Avoid working during rain, snow, or strong wind conditions. Areas with poor ventilation, such as internal corners, require enhanced drying measures.

Technical Requirements: Stir Wangtone Thermal Insulation Coating thoroughly before application. When applying multiple coats, ensure the previous layer is completely dry (typically 2–4 hours). Brushing, troweling, or spraying should be even—avoid excessive water addition or thick application to prevent sagging.

Leave your information and we will contact you.

微信截图_20250604113106.png

Customer services

Contact us

Email: rayways@126.com

Tel: 13588190066

TEL